M2 Engineering


Below is a partial listing of projects.

75th Street Construction - Kenosha, WI (WisDOT)
M Squared Engineering, LLC (M2) provides construction inspection services along 75th Street from 38th Avenue to 7th Avenue for a local street in Kenosha Wisconsin.  Work performed includes interpreting plans, specifications, and special provisions.  Inspection includes drainage, sub-grade, gravel base, concrete curb and gutter, concrete pavement, and performed survey volume verification with a total station.  The project was completed in January of 2010.

  IH-94 N-S Freeway: CTH C Interchange & Ramps (WisDOT)
M Squared Engineering, LLC (M2) is currently providing construction inspection services and assisting Collins Engineers in administering the construction contract. Work performed includes interpreting plans, specifications, and special provisions. Inspection includes drainage, sub-grade, gravel base, concrete, curb and gutter, base course asphalt, concrete pavement, electrical and performing survey construction verification.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

High-Speed Rail - Watertown to Madison (WisDOT)

M Squared Engineering, LLC (M2) has been involved in numerous railroad and railway projects throughout Wisconsin and Illinois. However, this is the first cross-state corridor project with a new rail system. Unique site challenges, accelerated schedules, and project design constraints have presented quite a challenge to not only the M2 team but to the entire project team. Under this contract awarded by the Wisconsin Department of Transportation, M2 partnered with HNTB and 16 other smaller firms and will perform a hydraulic analysis for all of the bridge crossings and the drainage crossings within the floodway.  The time line for M2‘s portion of the project was tightened due to delays in processing the original contract and the need to first have all of the bridges alongside the existing railroad built.

  USH 41 Reconstruction - Brown County, WI (WisDOT)
M Squared Engineering, LLC (M2) worked with HNTB on the USH 41 Reconstruction Project (Preliminary and Final Engineering). This project connects the Chicago-Milwaukee metropolitan area with the Fox River Valley industrial area and recreational areas of northeastern Wisconsin and upper Michigan. Increasing demands on USH 41 call for expansion from a four-lane divided arterial freeway to six lanes in Brown County from Orange Lane to Glory Road. During the Preliminary Engineering phase, M2 completed SSR hydraulic analyses for five bridge crossings over Ashwaubenon and Hemlock Creeks. In addition, hydrologic analysis was performed by M2 to verify FEMA flow values.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Family Dollar Development - Green Bay, WI
M Squared Engineering (M2) was retained to develop a site in Green Bay by a Florida developer. M2 will perform an ALTA survey, topographic survey, and CSM as required for combining three existing parcels. Asbestos abatement will be required for an existing building on one of the parcels. There is an existing floodplain on the southern third of the property. As the design proceeds, flood proofing of the proposed building and detention pond will be required. Other design services include grading, stormwater, pavement design, landscaping, erosion control, and utility plans. Site detail sheets and construction specifications will also be required. The stormwater management plan will need to comply with the City of Green Bay regulations. The developer is hoping to start construction of the Family Dollar Store in 2011. 

 

 

US Route 150 - Morton, IL (IDOT)
The project will improve US Route 150 beginning at Urbandale Avenue, in East Peoria to Detroit Avenue, in Morton, Illinois. These improvements will increase the two-lane rural highway to a three-lane urban highway. M Squared Engineering (M2) is responsible for the Location Drainage Study for this 6.0 mile corridor. Some site challenges include the meandering Dempsey Creek, located in a 40-50 foot deep ravine throughout the entire corridor.


. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IH-94 N-S Freeway Construction (WisDOT)
M Squared Engineering, LLC (M2) is currently providing construction inspection services for the I-94 N/S Freeway Construction project in south east Wisconsin.  Work performed includes interpreting plans, specifications, and special provisions.  Inspection includes drainage, sub-grade, gravel base, concrete, curb and gutter, base course asphalt, concrete pavement, electrical and performing survey construction verification.  The project will be completed in February of 2011.

 

 

Wisconsin State Park Shower Buildings - Various Sites, WI (WDNR)

M Squared Engineering, LLC (M2) designed flush toilet/shower buildings for three State Park facilities. M2 developed the templates for use in the replacement of flush toilet/shower facilities throughout the Wisconsin State Park system. The design included the septic system and environmental considerations. M2 is providing construction management for these projects.

Click here to see the construction video!

A longer version of the video can be found here

 

Home | About Us | Service List | Project List | Employees | S/W/M/EBE | Employment | News | Qualifications | Contact Us
©2010 M Squared Engineering. All rights reserved.
Services Projects Employees S/W/MBE Employment Qualifications Home About M2 Engineering News Contact Us Home Contact Us Site Map